Importers need clear commercial assumptions before comparing handgun safe suppliers. The following terms summarize LANGQING’s current working basis for standard products and customized projects. Final model, configuration, packaging, documents and delivery scope are confirmed in the written quotation and order documents.
Order terms at a glance
| Item | Current working basis |
|---|---|
| Standard order tiers | 50, 100 or 200 units, according to the confirmed model and quotation. |
| Customized-project MOQ | 500 units. |
| Sample pricing | Based on the 50-unit tier price. |
| Sample costs | Sample, freight and related charges are paid by the customer. |
| Standard mass production | Approximately 35 days after required approvals and deposit. |
| Customized project timing | About 45 days for development and sampling plus about 35 days for mass production; estimated total 80–90 days. |
| Payment | 30% deposit and 70% balance before shipment. |
| Standard trade term | FOB Shenzhen, Incoterms 2020. |
| US DDP | Quoted case by case after model, quantity, carton data and destination ZIP code are confirmed. |
| Warranty | One year from shipment, subject to claim verification. |
Standard products
Standard quotation tiers are designed for buyers evaluating an existing model without a full custom-development program. The exact unit price is not published because it depends on model, quantity, configuration, packaging and commercial scope. Request a written quotation for the current terms.
Samples
A sample allows the buyer to assess product format, access method and general workmanship before a bulk order. Sample units are quoted at the 50-unit tier price, and the customer pays the sample, freight and related charges. Any requested customization, special documentation or market testing is evaluated separately.
Customized projects
Customized projects start from 500 units. The scope can include approved changes to appearance, color, finish, logo placement, packaging, labels and documentation. New structures or electronics require a feasibility review. Customer-specific tooling, certification and compliance costs are paid by the customer after written approval.
How lead time is calculated
- Specifications, artwork and commercial terms must be confirmed before the schedule starts.
- Standard mass production is approximately 35 days under the approved order scope.
- Customized development normally requires about 45 days for development and sampling.
- After sample approval, customized mass production normally requires about 35 additional days.
- The resulting customized-project estimate is approximately 80–90 days, subject to the approved scope and material readiness.
Quoted timing is an estimate and should be reconfirmed for each order. Revisions, delayed artwork, additional testing or late sample approval can change the schedule.
Payment and shipment
The accepted payment structure is 30% deposit and 70% balance before shipment. FOB Shenzhen is the standard export basis. A US DDP door-to-door route may be assessed separately, but no DDP amount is final until the forwarder accepts the product description, final carton data and destination ZIP code.
Information needed for an accurate RFQ
- Product model or required format.
- Quantity and expected repeat-order volume.
- Destination country and ZIP code when DDP is requested.
- Access method and requested configuration.
- Logo, finish, packaging, label and manual requirements.
- Required FCC, CE or other market documents for review.
- Target approval and delivery schedule.
Providing these details allows LANGQING to separate standard supply, private-label changes and full development work, then confirm the appropriate MOQ, timing and quotation basis.
