Developing a custom product takes a clear process—from reviewing the initial design to approving samples and arranging production. At LANGQING Metal, we work with customers through the following stages to turn their 3D drawings into production-ready products.
1. Submit Your 3D Drawings
The process begins with the customer providing 3D drawings of the product to be developed. These drawings form the basis for our engineering review and customized quotation.
2. Structural Feasibility Assessment
Our engineers assess the feasibility of the proposed product structure. This review takes 1–2 working days and helps identify structural considerations before the project moves forward.
3. Receive a Customized Quotation
Once the assessment is complete, we prepare a customized quotation based on the reviewed design. Both parties confirm the quotation and proposed solution before proceeding to detailed structural drawings and sampling.
4. Structural Drawings and Sample Development
After the quotation is agreed, our team prepares the structural drawings and arranges sample development. A sample fee applies, and the sampling period is 10–15 working days.
5. Review and Approve the Sample
Customers can visit our factory to inspect and confirm the sample in person, or we can send the sample for review. Sample shipping costs are borne by the customer. Sample approval is required before moving to the next stage.
6. Tooling Development, Where Required
After the sample has passed acceptance, we proceed with tooling development if the product requires a mold. The tooling development period is 30–45 working days. Products that do not require tooling can proceed directly to mass-production scheduling after sample approval.
7. Mass Production
When no tooling is required, or once tooling development is complete, we can arrange mass production. The production period is 25–35 working days.
8. Shipment Arrangement
Once production is complete, we arrange shipment of the finished products according to the agreed shipping arrangements.
Development Timeline at a Glance
| Stage | Period / Requirement |
|---|---|
| Structural feasibility assessment | 1–2 working days |
| Customized quotation | Prepared after the assessment |
| Structural drawings and sampling | Sampling: 10–15 working days; sample fee applies |
| Sample approval | Factory visit or sample delivery; sample shipping paid by the customer |
| Tooling development, if required | 30–45 working days after sample acceptance |
| Mass production | 25–35 working days |
| Shipment | Arranged after production is complete |
The periods above apply to the individual stages and do not include customer review time or sample transportation time. The project schedule should be confirmed for the specific order.